By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
SO KONNECTSO KONNECTSO KONNECT
Notification Show More
Font ResizerAa
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Reading: Eskom announces longer hours of load shedding on Thursday
Share
Font ResizerAa
SO KONNECTSO KONNECT
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Search
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Have an existing account? Sign In
Follow US
© Sokonnect News Network.. All Rights Reserved.
Home » Blog » Eskom announces longer hours of load shedding on Thursday
News

Eskom announces longer hours of load shedding on Thursday

sokonnect
Last updated: September 8, 2022 12:26 pm
sokonnect Published September 8, 2022
Share
SHARE



It’s back to reality as Eskom unsurprisingly announced that the stage 2 load shedding currently underway will be implemented throughout Thursday night. It was previously scheduled to end at 10pm.

The dark lords of Megawatt Park said the stage 2 power cuts will continue to be implemented from 5am until 10pm on Friday and Saturday.

ALSO READ: Load shedding is back! Stage 2 expected until Saturday night

Eskom spokesperson Sikonathi Mantshantsha said the additional load shedding on Thursday night is needed to manage and preserve the pumped storage dam levels, which have been utilised extensively over the past four days. The pumped storage dam levels form part of the emergency generation reserves.

#POWERALERT1

Stage 2 loadshedding will be implemented throughout Thursday night; thereafter Stage 2
loadshedding will continue to be implemented daily at 05:00 – 22:00 until Saturday as previously
communicated pic.twitter.com/3VBvWlpa7f— Eskom Hld SOC Ltd (@Eskom_SA) September 8, 2022

“We currently have 4 588MW on planned maintenance, while another 15 204MW of capacity is unavailable due to breakdowns,” said Mantshantsha.

“Eskom therefore urges all South Africans to continue using electricity sparingly, and will promptly communicate should there be any significant changes.”

Dangers of load shedding

Meanwhile, The Environment and Infrastructure Services Department (EISD) has warned the residents of Johannesburg to be vigilant as power cuts keep South Africans in the dark.

MMC for EISD in the City of Johannesburg, Michael Sun, said load shedding is not only about being in the dark due to blackouts.

“It is the exact time cable thieves strike and our infrastructure becomes vulnerable to outages.”

“Not only does load shedding provide a handy schedule to the thugs that steal our cables and other equipment without the risk of electrocution, but City Power infrastructure wasn’t designed to be constantly powered up and powered down. The whole process makes the system more susceptible to faults,” Sun said.

ALSO READ: Joburg residents warned to be vigilant as load shedding kicks in

TAGGED:announcesEskomHoursLoadlongersheddingThursday
Share This Article
Facebook Twitter Whatsapp Whatsapp Email Print
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© Sokonnect News Network.. All Rights Reserved.
Welcome Back!

Sign in to your account

Lost your password?