By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
SO KONNECTSO KONNECTSO KONNECT
Notification Show More
Font ResizerAa
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Reading: Stage 4 load shedding back until Thurday
Share
Font ResizerAa
SO KONNECTSO KONNECT
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Search
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Have an existing account? Sign In
Follow US
© Sokonnect News Network.. All Rights Reserved.
Home » Blog » Stage 4 load shedding back until Thurday
News

Stage 4 load shedding back until Thurday

sokonnect
Last updated: September 13, 2022 7:07 am
sokonnect Published September 13, 2022
Share
SHARE



Eskom has announced that it will be implementing stage 4 load shedding, starting at 10am on Tuesday until 5am on Thursday morning.

The dark lords at Megawatt Park said the escalation of rolling blackouts to stage 4 was the result of a problem at the Kendal Power Station.

“A sudden tripping of three Kendal Power Station units (1 920MW maximum generating capacity) has forced the implementation of Stage 4 load shedding starting at 10:00 this morning.

“This will last until 05:00 on Thursday morning.” Eskom said.

ALSO READ: Load shedding likely to continue as maintenance not helping – Eskom COO Oberholzer

Load shedding during Summer

On Monday, the givers and takers of light said deliberate sporadic power cuts were likely to be implemented during summer months.

The embattled power utility gave an update on the current system challenges, this as the country currently battles another bout of load shedding

Eskom Chief Operating Officer Jan Oberholzer said Eskom suffered a ‘disastrous’ week as 42 generating units tripped, which resulted in the current blackouts.

He said there are likely to be power cuts during the summer months too.

“We are ramping up planned maintenance as we head into summer. We also find that our maintenance is not yet yielding required results. Units return to work, and then breakdown. This is due to lack of skills.”

Oberholzer said there have been a number of comments surrounding why Eskom is load shedding because President Cyril Ramaphosa’s plan on the energy crisis should have helped.

ALSO READ: Cooler weather for Gauteng with possibility of rain

TAGGED:LoadsheddingstageThurday
Share This Article
Facebook Twitter Whatsapp Whatsapp Email Print
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© Sokonnect News Network.. All Rights Reserved.
Welcome Back!

Sign in to your account

Lost your password?