Dreams of lower stages of load shedding leading up to Christmas have been dashed, after Eskom announced stage 6 was implemented on Friday monring.
“This was necessary due to the failure of 8 generating units overnight and the excessive reliance on OCGTs [Open Cycle Gas Turbines] and pumped storage generation that is rapidly depleting these reserves,” the power utility explained.