By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
SO KONNECTSO KONNECTSO KONNECT
Notification Show More
Font ResizerAa
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Reading: Eskom announces stage 6 load shedding to kick off the week
Share
Font ResizerAa
SO KONNECTSO KONNECT
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Search
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Have an existing account? Sign In
Follow US
© Sokonnect News Network.. All Rights Reserved.
Home » Blog » Eskom announces stage 6 load shedding to kick off the week
News

Eskom announces stage 6 load shedding to kick off the week

sokonnect
Last updated: February 20, 2023 5:25 am
sokonnect Published February 20, 2023
Share
SHARE

Contents
Stage 6 until further noticeFurther changes at short noticeNational state of disaster



South Africans are in for a rough start to the week after ailing parastatal Eskom announced stage 6 load shedding this weekend.

The higher levels of electricity rationing comes as a result of breakdowns of eight generation units on Sunday.

Stage 6 until further notice

“Stage 6 load shedding will be implemented continuously until further notice. Since Sunday afternoon a generating unit each at Arnot, Hendrina, Lethabo and Majuba, as well as two units at Camden Power Station have suffered breakdowns and taken offline for repairs,” said Eskom spokesperson Sikonathi Mantshantsha.

“Further, two generating units at the Lethabo Power Station were shut down due to coal constraints as the New Vaal Mine that is supplying the station has been unable to deliver the expected amount of coal during the past week because of the heavy rains.”

ALSO READ: Electricity minister needs to be ‘very special’, De Ruyter touted as ‘good candidate

Further changes at short notice

Mantshantsha said given the high number of breakdowns, South Africans must prepare for further changes in the stages of load shedding at short notice.

“The three running units are operating at minimum capacity and are at risk of shutdown should the coal supply constraints not be resolved. A further update will be published as soon as any significant changes occur.”

“Breakdowns currently amount to 21 243MW of generating capacity while 3 566W of generating capacity is out of service for planned maintenance,” Mantshantsha said.

National state of disaster

The deliberate power cuts pushed President Cyril Ramaphosa last week to declare the Eskom crisis a national state of disaster with immediate effect during the State of the Nation Address.

The president also said he would appoint a minister of electricity in the Presidency and the minister will focus full-time on working with Eskom to end load shedding.

Compiled by Faizel Patel

ALSO READ: Expect stage 8 this winter: 59% of Eskom’s coal fleet is unavailable

TAGGED:announcesEskomkickLoadsheddingstageWeek
Share This Article
Facebook Twitter Whatsapp Whatsapp Email Print
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© Sokonnect News Network.. All Rights Reserved.
Welcome Back!

Sign in to your account

Lost your password?