By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
SO KONNECTSO KONNECTSO KONNECT
Notification Show More
Font ResizerAa
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Reading: Eskom warns ‘system constrained’ load shedding could be implemented
Share
Font ResizerAa
SO KONNECTSO KONNECT
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Search
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Have an existing account? Sign In
Follow US
© Sokonnect News Network.. All Rights Reserved.
Home » Blog » Eskom warns ‘system constrained’ load shedding could be implemented
News

Eskom warns ‘system constrained’ load shedding could be implemented

sokonnect
Last updated: March 25, 2025 6:57 am
sokonnect Published March 25, 2025
Share
SHARE

Contents
Eskom issued an urgent alert about a high risk of load shedding on Monday evening.‘System constrained’ – EskomWinter maintenanceEskom power stationsWinter outlook

Eskom issued an urgent alert about a high risk of load shedding on Monday evening.

While Eskom did not implement stage 2 load shedding on Monday, the parastatal has warned South Africans of rolling blackouts at short notice.

Eskom issued an urgent alert about a high risk of load shedding on Monday evening.

‘System constrained’ – Eskom

The parastatal’s spokesperson, Daphne Mokwena, said the system remains constrained.

“While we managed to keep the system stable, it remains constrained and load shedding may still be implemented at short notice if necessary.

“Work continues to bring six generation units back online, with one unit already restored. Our teams are closely monitoring the situation, and we will provide further updates as needed,” Mokwena said.

ALSO READ: Eskom warns of high risk of stage 2 load shedding on Monday

Winter maintenance

Earlier this month, Eskom warned that its planned maintenance outages will continue as it prepares for the upcoming winter season.

Mokwena said the utility recovered over 3000 MW generation capacity and replenished emergency reserves after Eskom implemented stage 2 load shedding at short notice.

“We maintain our position that load shedding is largely behind us due to structural improvements in the generation fleet.  While baseload capacity remains constrained, our generation recovery plan is addressing this challenge.”

Eskom power stations

During a media briefing, Electricity and Energy Minister Kgosientsho Ramokgopa said he was “exceptionally disappointed” with the recent performance of Eskom’s power stations.

The minister visited some power stations to get an understanding of what had caused the setback.

Ramokgopa expressed that the problems at Eskom’s power stations were “non-technical related issues”.

“Clearly, we have become complacent. So it can’t be normal; it can’t be that we are reversing the gains that we have accumulated over time. I already know what are the candidate power stations that are consistently dropping the ball.”

Winter outlook

Ramokgopa apologised for the power cuts, reiterating that South Africans should never accept load-shedding as a normal occurrence.

He added that Eskom will release its winter outlook within two to three weeks.

ALSO READ: Winter is coming: Eskom warns that planned maintenance will continue

TAGGED:constrainedEskomimplementedLoadsheddingsystemwarns
Share This Article
Facebook Twitter Whatsapp Whatsapp Email Print
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© Sokonnect News Network.. All Rights Reserved.
Welcome Back!

Sign in to your account

Lost your password?