By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
SO KONNECTSO KONNECTSO KONNECT
Notification Show More
Font ResizerAa
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Reading: SA has no chill for Eskom’s load shedding update
Share
Font ResizerAa
SO KONNECTSO KONNECT
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Search
  • Home
  • Entertainment
  • News
  • Music
  • Sports
  • Business
  • Politics
Have an existing account? Sign In
Follow US
© Sokonnect News Network.. All Rights Reserved.
Home » Blog » SA has no chill for Eskom’s load shedding update
News

SA has no chill for Eskom’s load shedding update

sokonnect
Last updated: September 27, 2022 1:57 pm
sokonnect Published September 27, 2022
Share
SHARE



Eskom will be implementing stage 4 load shedding from 4pm on Tuesday, 27 September until midnight, and South Africans have no time for it.

The ‘reminder’ follows after the embattled power utility implemented stage 3 until Thursday, between 12am and 4pm.

Currently: Stage 4 load shedding

However, once the clock strikes 4pm, stage 4 load shedding will come into effect until 12am – the ‘evening peak times’.

On Sunday, Eskom said another announcement will be published on Wednesday, “or as soon as there are any significant changes”.

Since nothing significant changed since then, we’re alternating between stage 3 and stage 4 rolling blackouts every day.

Diesel shortage

Why? Because Eskom is allegedly “still experiencing constraints from its diesel suppliers”, which is affecting service to the Ankerlig and Gourikwa Open Cycle Gas Turbines.

Even though Eskom is expecting diesel deliveries on Thursday, the power utility said “the uncertainty of supply persists”, and higher stages of load shedding may be required.

In addition, one generation unit had been removed from both Camden and Kriel power stations “for repairs“.

ALSO WATCH: Here’s how Eskom generates (or tries to) the electricity we use

South Africans react

Of course, South Africans took the comment section of Eskom’s tweet, and the lack of chill was noticeable.

One user said: “Please, we know, don’t remind us of this nonsense. Just tell us when you are able to deliver what you are supposed to deliver”.

Another netizen couldn’t stand that South Africa is “now the laughing stock of Namibia”, while another said:

“Msunu wena nonke and equally futhi [trash emoji]. Might as well keep your damn electricity”.

ALSO READ: ‘Load shedding is here to stay’ – Ramaphosa

We’ve included more gems below, for your amusement.

No need to remind us you’re incapable of doing your jobs, we know ????????????????— James Garrett (@garrettjames6) September 27, 2022

We are still in stage 5 we’re not stupid— Nanzy (@Nanzy79848273) September 27, 2022

Pick a stage and stick with it youre up and down like a moody teenager jesus christ— Blackmetalpanda (@Blackmetalpand1) September 27, 2022

Tell your people to lift the lever up for Jhb CBD, kade phela uhambile ugesi, nayi imhlola— OuuuuuChavo (@OuuuuuChavo) September 27, 2022

pic.twitter.com/Te0OgUCaF8— Zulu Super Saiyan ???? (@Nkomo_88) September 27, 2022

Could you I don’t know reduce us to stage 0 that would be nice— Noctal (ノクタール ) (@Noctal10) September 27, 2022

Updating us on stages it’s useless, since the time slot was scheduled on a higher stage,you keep changing stages but the time slot remains the same????????????????— Tshepo Mawelela (@mawexdon) September 27, 2022

Eksom pro trip if you loadshedding the stuff will breuk— PJ Hamzen (@PJHamzen) September 27, 2022

TAGGED:ChillEskomsLoadsheddingupdate
Share This Article
Facebook Twitter Whatsapp Whatsapp Email Print
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

© Sokonnect News Network.. All Rights Reserved.
Welcome Back!

Sign in to your account

Lost your password?